ATLANTIC CONTAINER LINE
|

ATLANTIC CONTAINER LINE

Construction of ACL’s U.S. headquarters in Westfield, NJ was based on a unique design, created by TSC, featuring three nautical inspired concepts. The café on the second floor revolves around a simulated ship propeller that stretches twelve feet in diameter. The elevator lobbies on the second and third floors are constructed with angled walls consisting […]

READ ARTICLE
investors bank outside
|

Investors Bank Carteret

The new bank building project began with site remediation. Additional site improvements, such as, dome ceilings, high end finishes, parking lot paving, drive through ATM’s and full-service tellers were included to complete this important bank building project. For more information on the construction services we offer or to find out how we can work with […]

READ ARTICLE
Investors bank Cranford, nj
|

Investors Bank Cranford

The exterior renovations for this project consisted of stone, brick and E.I.F.S. The interior renovation includes high-end finishes, ceramic tile, LVT, carpet flooring, reveal channels, dome ceiling and soffits. Also included in this renovation were wood jams, doors, casework, aluminum/glass offices, and teller counters. This project was completed on time in 20 weeks.

READ ARTICLE
Sanmar Warehouse Renovation Project
|

Sanmar Warehouse Renovation Project

This sizable warehouse renovation project included the addition of a 145,000 SQ. DT. Mezzanine for product sorting, an elevator, 14 HVAC roof top units which were installed via helicopter and energy efficient motion sensor lighting. In addition, Unity created much needed business office space and a showroom for the client. The exterior of the precast […]

READ ARTICLE
|

Mt. Sinai Ambulatory Surgical Center

Unity Construction Services, Inc. modified the existing mechanical, electrical, plumbing and converted the Surgical Center to accommodate two soils utility rooms, nurses’ medication station, surgical equipment, clean storage room, sterile room, two surgical rooms, and added a new gurney station at the corridor. This allowed the practice to open back up quickly as scheduled. The […]

READ ARTICLE
Leo Pharma conference room
|

Multinational Pharmaceutical Company

Two phase interior renovation project consisting of complete demolition and new construction. Collaborative open area office space with LVT flooring and carpet tiles throughout. A secondary boardroom, new conference rooms, individual huddle rooms, new library, training room and conference rooms were created. An innovation area with open ceilings, exposed ductwork and pendant lighting highlight the […]

READ ARTICLE
|

Multinational Pharmaceutical Company

The renovation of this project consisted of a complete demolition of the space. Collaborative open office space area with carpet tiles throughout. New reception, town hall collaborative space, boardrooms, conference rooms, individual huddle rooms, phone rooms and a training room were created. New demountable glass partitions and doors line the open office area. Italian tile […]

READ ARTICLE
HORIBA's Science Facility Construction Project
|

HORIBA Scientific

HORIBA Scientific is a branch of the even larger corporation HORIBA. Founded in Japan in 1945, HORIBA is an international company that provides intricate systems and instruments for anything from medical diagnosis, quality control and research for developmental technology. HORIBA scientific specifically manufactures technology used in elemental analysis, forensics, polymer creation and imaging. However, it […]

READ ARTICLE
Interior Office Renovation Project
|

CONNELL FOLEY

This project consisted of a multi-phase interior office renovation for the CEO and highest level executives within the firm. The timely fit-out included a 1,800 sq. ft. boardroom with eucalyptus wall panels, walnut Decoustics ceiling, Lutron integration for lighting and audio visual controls. A eucalyptus serpentine wall with colored glass panels and statuary bronze trim […]

READ ARTICLE
Sanofi Microbiology Lab
|

SANOFI

Demolish 538 SF of existing locker room space and convert to additional laboratory space. Furnish and install new walls, doors, casework, and finished. Furnish and install new exterior door access and structural steel ladder to interior mezzanine platform. Alterations to Existing MEP Systems including new lighting and epoxy flooring.

READ ARTICLE